Shaun Todd

Student of Architectural design

Pages

  • Home
  • Self Initiated Projects
  • Drawings
  • Technical Drawings
  • Rendered Images
  • Models
  • Buildings Visited
  • Curriculum Vitae
  • Contact me
SHOP FRONT AND NEW PROPOSED CONNECTION FROM THE SOUTH
Posted by Unknown
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

ENTRANCE AND CENTRAL SQUARE CONNECTING EXISTING SCHOOL TO THE NEW
Posted by Unknown
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
EAST CONNECTION TO POST GRAD CENTRE FROM SALTHOUSE ROAD
Posted by Unknown
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Ground floor internal space sketches
 
 
Posted by Unknown
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Preperation for my final crit on tuesdy.

Finding it difficult to compress my work without it effecting the narrative.



 
 
 




Posted by Unknown
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Blog Archive

  • ►  2016 (3)
    • ►  April (1)
    • ►  March (2)
  • ▼  2013 (13)
    • ▼  May (5)
      • SHOP FRONT AND NEW PROPOSED CONNECTION FROM THE SO...
      • ENTRANCE AND CENTRAL SQUARE CONNECTING EXISTING ...
      • EAST CONNECTION TO POST GRAD CENTRE FROM SALTHOUSE...
      • Ground floor internal space sketches    
      • Preperation for my final crit on tuesdy. Finding...
    • ►  April (2)
    • ►  March (6)
All work shown copyright of Shaun Alan Todd. Powered by Blogger.